The above normal temperatures have given us an opportunity to renovate the bunkers on the driving range. These bunkers needed a weeding, grading, and some new sand. This project will enhance the aesthetics on the range as well as provide better depth perception for practice shots.
 |
Before work commenced |
 |
Excavating old sand and sod. |
 |
Bed prep and the beginning of sand installation. |
 |
Sand being installed by Ghansha with the Ty-Crop Material Hauler. |
 |
Finished Bunker |